Trans Mountain Expansion Project, British Columbia
Cord
SUMMARYThe expansion twins an existing 1,150-kilometre pipeline between Strathcona County, Alberta and Burnaby, BC. It creates a pipeline system with the nominal capacity of the system going from approximately 300,000 barrels per day to 890,000 barrels per day. Apex responsibilities extended to providing survey support for the British Columbia pump stations and pipeline. Services consisted of topographic survey, grading, layout and asbuilts of piping and piling. In addition, Apex has performed underground line locates throughout. Services Provided
|